Note 1

Permits and stamped drawings

Engineering is provided by the manufacturer. Stamped drawings are available on request, depending on project and state.

Building codes generally require truss design drawings to be prepared for the specific project and submitted with the permit or delivered with the trusses. Who must seal them depends on the state and the building department. For cold-formed steel, the industry standard of practice (AISI S202) sets out who is responsible for what between the building designer and the component designer.

Confirm code, load and permit requirements with your local building department and the engineer of record.

Note 2

How steel framing differs from wood

  • Material. Wood shrinks and swells as its moisture content changes, which can lead to warping, bowing and twisting. Cold-formed steel does not change size with moisture.
  • Pests and rot. Steel is not food for decay fungi or termites. Steel relies on its galvanized (zinc) coating against corrosion, and coastal or wet sites may call for a heavier coating.
  • Insulation. Steel conducts heat far more than wood. Energy codes require extra insulation on steel-framed walls, usually a layer of continuous exterior insulation, to perform like a wood wall.
  • Labor. Steel framing uses different tools, screws and methods. HUD field studies found it took a little to a lot more labor than wood, depending heavily on crew experience. Panelized walls and trusses move much of that work off site.
  • Cost. Steel framing generally costs more than wood up front. See the calculator for a planning range and the full comparison.

Note 3

Lead times

Lead times vary by manufacturer, product, engineering review and season. The manufacturer states the lead time with your quote. We do not promise delivery dates. If you have a deadline, say so in your request.

Note 4

What to send for a quote

  1. Plans: PDF or DWG is best. Photos of paper plans work to start.
  2. The project address or county, so loads can be set for the location.
  3. What you need: roof trusses, floor trusses, wall panels, or the full frame.
  4. Footprint, number of stories, wall heights and roof pitch if you do not have plans.
  5. Roofing material and any heavy loads (tile, solar, storage lofts).
  6. Your timeline and whether you have a crew lined up.

Use the quote form, or email chad@cpenterprisessc.com.

Note 5

Steel vs. wood: sources we use

Every comparison on this site links to its source. Trade groups are labeled.

Questions

Questions

Do I need a permit for steel framing?

Most new buildings and additions need a permit, whatever they are framed with. Your city or county building department decides. Contact them before you order framing.

Are stamped drawings included?

Engineering is provided by the manufacturer. Stamped drawings are available on request, depending on project and state. Tell us what your building department requires when you request a quote.

Who is the engineer of record?

On many projects the engineer of record is the architect or structural engineer who designs the building. The framing manufacturer designs its components, such as trusses, to work within that design. On smaller projects the arrangement varies, so ask your building department.

How long does it take to get framing delivered?

Lead times vary by manufacturer, product and season. The manufacturer states the lead time with your quote. We do not promise delivery dates.

Can my wood framing crew put up steel?

Steel framing uses different tools, screws and methods. Crews new to steel usually need time to learn. Panelized walls and trusses reduce the on-site work. Ask your crew whether they have framed steel before.

What file types can I send?

PDF and DWG are best. JPG and PNG photos of plans also work. You can email plans to chad@cpenterprisessc.com.