Takeoff: steel vs. wood framing

Steel vs. wood calculator

A planning tool, not a quote. For wood and for steel it adds up three costs: materials, framing labor, and framing time at your own cost per day. Then weigh the totals against the factors below.

Example values

The rates behind this calculator are placeholder examples, not market prices. They will be replaced with figures from manufacturer and lumber quotes. Use the result only to see how the calculation works.

Inputs

Building type
Stories
What to compare

What each extra day of framing costs you: loan interest, equipment rental, supervision, other trades waiting. Crew pay is counted in Labor.

Result

Example values

Wood framing

Materials
$24,900 to $49,700
Labor
$11,300 to $22,600
Framing time 5.5 to 11.5 days at $200/day
$1,100 to $2,300
Total
$37,300 to $74,600

Steel framing

Materials
$30,500 to $61,000
Labor
$11,300 to $28,300
Framing time 5.5 to 17 days at $200/day
$1,100 to $3,400
Total
$42,900 to $92,700
Steel minus wood, total+$5,600 to +$18,100

One story on a slab has no framed floor, so floors add nothing here.

Quantities and cost by part
Framing quantities and material and labor ranges by part
PartQty (sq ft)Wood materialsWood laborSteel materialsSteel labor
Roof 2,236 sq ft2,236$11,200 to $22,400$4,500 to $8,900$13,400 to $26,800$4,500 to $11,200
Walls 3,415 sq ft3,415$13,700 to $27,300$6,800 to $13,700$17,100 to $34,200$6,800 to $17,100

Estimate only. Your manufacturer will provide actual pricing.

How this is calculated

Three costs for each material: framing materials (the package as priced by a supplier), framing labor (the crew's pay to stand the frame), and framing time (how many days framing takes, times your own cost per day while the job runs). Excludes foundation, sheathing, roofing, insulation, finishes, permits, engineering fees and delivery unless your quotes include them.

  • Footprint is treated as a rectangle twice as long as it is wide, so perimeter = 6 x sqrt(footprint / 2).
  • Sloped roof area = footprint x sqrt(1 + (pitch / 12)^2). Overhangs are not included.
  • Exterior wall area = perimeter x wall height x stories, plus the interior wall allowance for the building type. Openings are not deducted.
  • Framed floor area = footprint x (stories - 1). The ground floor is assumed to be a slab.
  • Labor = the same quantities as materials x a labor rate per sq ft for each material.
  • Framing days = quantity / 1,000 x crew days per 1,000 sq ft, rounded to the nearest half day. Time cost = framing days x your cost per day (loan interest, equipment rental, supervision, other trades waiting). Crew pay is in Labor, not here, so nothing is counted twice.
  • Dollar amounts are rounded to the nearest $100.

Each part's quantity is multiplied by a low and high rate for each material, for materials and for labor, then by a regional factor for the state. Framing time is turned into dollars with your cost per day. The result is a range, not a single price.

Framing time depends heavily on the crew. In HUD field studies, crews new to steel took longer than with wood, while panels and trusses built in a factory move much of the work off site. Enter what fits your job.

Notes: assumptions used

ItemRangeUnitStatusSource
Materials: roof, wood5–10USD per sq ft of sloped roof areaExample valueEXAMPLE VALUE, checked 2026-10-04
Materials: roof, steel6–12USD per sq ft of sloped roof areaExample valueEXAMPLE VALUE, checked 2026-10-04
Materials: walls, wood4–8USD per sq ft of framed wall areaExample valueEXAMPLE VALUE, checked 2026-10-04
Materials: walls, steel5–10USD per sq ft of framed wall areaExample valueEXAMPLE VALUE, checked 2026-10-04
Materials: floors, wood5–10USD per sq ft of framed floor areaExample valueEXAMPLE VALUE, checked 2026-10-04
Materials: floors, steel6–12USD per sq ft of framed floor areaExample valueEXAMPLE VALUE, checked 2026-10-04
Labor: roof, wood2–4USD of framing labor per sq ft of sloped roof areaExample valueEXAMPLE VALUE, checked 2026-10-05
Labor: roof, steel2–5USD of framing labor per sq ft of sloped roof areaExample valueEXAMPLE VALUE, checked 2026-10-05
Labor: walls, wood2–4USD of framing labor per sq ft of framed wall areaExample valueEXAMPLE VALUE, checked 2026-10-05
Labor: walls, steel2–5USD of framing labor per sq ft of framed wall areaExample valueEXAMPLE VALUE, checked 2026-10-05
Labor: floors, wood2–4USD of framing labor per sq ft of framed floor areaExample valueEXAMPLE VALUE, checked 2026-10-05
Labor: floors, steel2–5USD of framing labor per sq ft of framed floor areaExample valueEXAMPLE VALUE, checked 2026-10-05
Framing time: roof, wood1–2crew days per 1,000 sq ft of sloped roof areaExample valueEXAMPLE VALUE, checked 2026-10-05
Framing time: roof, steel1–3crew days per 1,000 sq ft of sloped roof areaExample valueEXAMPLE VALUE, checked 2026-10-05
Framing time: walls, wood1–2crew days per 1,000 sq ft of framed wall areaExample valueEXAMPLE VALUE, checked 2026-10-05
Framing time: walls, steel1–3crew days per 1,000 sq ft of framed wall areaExample valueEXAMPLE VALUE, checked 2026-10-05
Framing time: floors, wood1–2crew days per 1,000 sq ft of framed floor areaExample valueEXAMPLE VALUE, checked 2026-10-05
Framing time: floors, steel1–3crew days per 1,000 sq ft of framed floor areaExample valueEXAMPLE VALUE, checked 2026-10-05
Starting cost per day$200USD per day of framing (starting value; visitors can change it)Example valueEXAMPLE VALUE
Regional factor (all states)1multiplier applied to both materialsExample valueEXAMPLE VALUE
Interior wall allowance1 / 0.5 / 0 / 0.5house / barndominium / garage or shop / commercialExample valueEXAMPLE VALUE

Schedule: non-price factors

What you get for the difference

Price is one column. These are the others, with sources. Where the evidence is mixed, we say so. Sources marked as trade groups come from an industry with an interest in one material.

FactorWhat the sources sayFavorsEvidenceSources
Up-front costSteel framing generally costs more than wood up front. In a HUD study from the early 1990s, steel walls cost about 7% more than wood and the steel roof about 36% more. In a 2002 HUD demonstration in Beaufort, SC, the steel framing package cost about 42% more, partly blamed on an inexperienced steel crew. Both studies are old. Treat them as direction, not current prices.Woodconsistent
Straightness and dimensional consistencyWood shrinks and swells as its moisture content changes, which can lead to warping, bowing and twisting. Cold-formed steel does not change size with moisture.Steelconsistent
Rot, mold and termitesSteel is not food for decay fungi or termites. Steel relies on its galvanized (zinc) coating against corrosion, and coastal or wet sites may call for a heavier coating. Subterranean termites are more common in southern states. Ask the manufacturer what coating weight they specify near the coast.Steelconsistent
Combustibility and fireCold-formed steel is a noncombustible material. Fire-resistance ratings belong to tested assemblies (framing plus gypsum board and other layers), and wood-frame assemblies can also be rated. We make no fire-rating claim. Ratings come from the tested assembly your designer specifies.Mixedconsistent
Insulation and energySteel conducts heat far more than wood. Energy codes require extra insulation on steel-framed walls, usually a layer of continuous exterior insulation, to perform like a wood wall. Budget for continuous insulation when comparing prices.Woodconsistent
Installation speed and crew skillSteel framing uses different tools, screws and methods. HUD field studies found it took a little to a lot more labor than wood, depending heavily on crew experience. Panelized walls and trusses move much of that work off site. Ask whether your crew has framed steel before.Mixedmixed
Handling and deliverySteel members arrive straight and uniform and can be ordered cut to length, usually at extra cost. Steel scrap is recyclable. Weight per foot depends on gauge: a common 2x4-size steel stud weighs about the same as a 2x4. Weight savings claims depend on the gauge used.Mixedmixed
InsuranceInsurers rate buildings by construction class, and the class depends on the whole building, not only the studs. We found no independent public data showing lower homeowner premiums for steel-framed houses. Ask your insurance agent before counting on a savings.Dependsweak
StrengthNeither material is stronger in every case. Load capacity depends on member size, wood species and grade or steel gauge, height and bracing. Both are engineered to carry the loads your project requires. The manufacturer's engineering sets member sizes for your loads.Dependsconsistent

Sources checked 2026-10-04. Confirm code, load and permit requirements with your local building department and the engineer of record.